Marcus Ellison
Charleston, SC
(843) 555-0142 · marcus@marcus-ellison.linkdfolio.com
Hiring Team
Manufacturing Engineering
Tesla
Dear Tesla Manufacturing Engineering team,
In February 2026, Tesla built its first Cybercab at Giga Texas and announced plans to produce it with the unboxed process, joining large sections of the vehicle near the end of the line. Joining large sections is the core of my current role, and it is the main reason I am applying for the Manufacturing Engineer position.In February 2026, Tesla built its first Cybercab at Giga Texas and announced plans to produce it with the unboxed process, in which large sections of the vehicle are built in parallel and joined near the end of the line. Joining large sections is the core of my current role, and it is the main reason I am applying for the Manufacturing Engineer position.
For the past two years I have been a manufacturing engineer on the Boeing 787 program in North Charleston, where I own the work instructions for the aft fuselage join. Working with technicians across all three shifts, I rewrote 40 of them and reduced rework on the join by 30 percent. I would like to bring that discipline to a high-volume line where each improvement shows its effect within days.For the past two years I have been a manufacturing engineer on the Boeing 787 program in North Charleston, where I own the work instructions and process changes for the aft fuselage join. Working with technicians across all three shifts, I rewrote 40 of those instructions and reduced rework on the join by 30 percent. The 787 line builds about five aircraft a month, and I would like to bring the same discipline to a high-volume line where each improvement shows its effect within days.
Your posting also calls for lean methods to reduce cycle time, and I measure before I change anything. As an intern at GE Aerospace, I completed 25 time studies on a turbine blade grinding cell and found that setups ran 40 percent over standard. That work is where I learned to apply lean methods.Your posting also calls for lean methods to reduce cycle time, and I approach that work by measuring before I change anything. As an intern at GE Aerospace, I completed 25 time studies on a turbine blade grinding cell and found that setups ran 40 percent over standard. In a university project, I rebalanced a five-station assembly line and increased its output by 20 percent. Those projects are where I learned to apply lean methods.
The role also requires leading root cause and designing fixtures with GD&T. When a fastener defect kept returning on the 787 join, I led the investigation and found that the parts were correct but the assembly steps were out of order. Resequencing the job now saves about three hours of rework on every aircraft. At GE, I redesigned a fixture stop in SolidWorks using GD&T, which cut setup time from 50 minutes to 30, and for my senior capstone at Georgia Tech I designed and machined a drilling jig that reduced drilling time per part from six minutes to two.
I would begin at Giga Texas the way I began at Boeing, on the line with the technicians who use the work instructions, learning where those instructions slow the work down. Thank you for your consideration. I would welcome the chance to discuss how I could contribute to your team.I would begin at Giga Texas the way I began at Boeing, by spending my first weeks on the line with the technicians who use the work instructions and learning where those instructions slow the work down. Thank you for your consideration. I would welcome the opportunity to discuss how I could contribute to your team.
Sincerely,
Marcus Ellison



